S.R. 826 (Palmetto Expressway) / S.R. 836 (Dolphin Expressway) Interchange Reconstruction


FIN # 249581-1-52-01

Project Limits:
The construction limits are approximately just north of SW 8th Street to south of NW 25th Street on S.R. 826; just west of NW 82nd Avenue to NW 57th Avenue on S.R. 836

Project Summary:
The S.R. 826 and S.R. 836 Interchange will be reconstructed to enhance safety and reduce congestion for motorists using the Interchange. This reconstruction project includes widening along both S.R. 826 and S.R. 836, the construction of a four-level interchange as well as the reconstruction of the Flagler Street/S.R. 826 and the Milam Dairy Road/NW 72nd Avenue/S.R. 836 interchanges. The project will include the construction of over 40 bridges and upon completion will provide motorists direct connections in all directions between S.R. 826 and S.R. 836. 

Start Date: November 30, 2009

Completion: 2015

Construction Cost: $559 million

Project Team:

FDOT South Miami-Dade Resident Engineer:
Erik Padron, P.E.

FDOT Construction Project Manager:
Dari Vorce

FDOT Design Project Manager:
Ali Toghiani, P.E.

Construction Engineering & Inspection:
AIM Engineering

Contractor:
Community Asphalt, /Condotte America/, The de Moya Group JV, LLC

Designer:
BCC Engineering

Public Information Specialist:
Oscar Gonzalez
(786) 280-0983

For more information about this project or the scope of work,
please contact the Palmetto Expressway Public Information Specialist at (786) 280-0983, email him at OGonzalez@mrgmiami.com or log onto www.826-836.com .