Palmetto Expressway (SR 826) at
SW 24th St. / Coral Way &
SW 8th St. /
Tamiami Trail Interchanges
WPI # 249648

FIN #249648-1-52-01

Project Summary:
As part of the overall improvement program for the Palmetto Expressway, the Florida Department of Transportation (FDOT), District 6, has begun two separate but related projects at the SW 24 th Street
(Coral Way) and SW 8 th Street (Tamiami Trail) interchanges. These projects included the following:

  • Reconstruction and widening of the Palmetto Expressway (SR 826), including the addition of one general use lane and one (northbound and southbound) lane.
  • Reconstruction of all ramps, and the access ramp bridge to Coral Way over the Coral Gables Canal.
  • Reconstruction of the Palmetto Expressway (SR 826) bridge over Coral Way and widening of mainline bridge over SW 8th Street.
  • Reconstruction (relocation) of the pedestrian overpass over the southbound Coral Way exit ramp.
  • Addition of bulkheads and noise walls along the Palmetto Expressway (SR 826).
  • Addition of bridges over SW 8th Street for access ramps to and from the Palmetto Expressway (SR 826).
  • Reconfiguration of access ramps to and from the Palmetto Expressway (SR 826) and widening to include shoulder widths.
  • Widening of ramp bridge over Tamiami Canal to northbound Palmetto Expressway (SR 826).
  • Widening and reconstruction of over 2100 feet of SW 8th Street and lower it under the Palmetto Expressway (SR 826). Relocation of a 30” water main under eastbound SW 8th Street.
  • Construct drainage improvements, detention ponds, overhead sign structures, roadway lighting, and new traffic signals at SW 8th and SW 24th Streets.

Start Date: June 2005
End Date: Early 2008

Please note that this schedule is tentative and could be impacted by bad weather or other unforeseen circumstances.

Cost & Funding: $81 million

Lane Closures

Project Team Members:
FDOT Construction Project Manager: Dari Vorce
CCEI Senior Project Engineer:
Tim Sears, P.E., A2 Group
Contractor:
APAC Southeast, Inc.
Construction Public Information Specialist:
Jeannette Lazo

For further questions about this project or the scope of work,
please contact the Palmetto Expressway (SR 826)
Public Information Specialist at (305) 499-2417 or
email at info@fdotpalmetto.com

Project Fact Sheet
Fact sheet

 

PHOTO GALLERY
Click the aerial photos below for a larger image...

Coral Way Aug 15 2006
Coral Way 8-15-06

Tamiami Trail Aerial 8/15/06
Tamiami Trail 8-15-06